PET Bottle Carbonated Beverage Production Line

A modern carbonated beverage production line designed for plastic bottle packaging is composed of various specialized equipment to ensure efficient, high-quality production. This production process involves several key stages: preparation, carbonation, filling and packaging.

Video

Detail Photos

Description

Equipment Composition of a Carbonated Beverage Production Line with Plastic Bottle Packaging

  1. Mixing and Syrup Preparation: is to preparation of the beverage syrup. Ingredients such as sweeteners, flavors, and colorings are blended in precise ratios using a syrup mixing system. The syrup is then cooled and stored until needed.
  2. Carbonation: After syrup preparation, the beverage is mixed with carbon dioxide (CO2) to achieve the desired level of carbonation. The carbonation machine ensures uniform CO2 absorption under controlled pressure and temperature.
  3. Filling Machine: The carbonated liquid is transferred to filling machines, where it is automatically poured into pre-formed plastic bottles. These machines ensure the precise filling of each bottle to the correct volume and minimize wastage.
  4. then will be pasteurization tunnel for fixing CO2 stably and labeling, coding, packing etc.

Main Technical Parameters

ModelDCGF12-12-4DCGF18-18-6DCGF24-24-8DCGF32-32-10DCGF40-40-12DCGF50-50-15DCGF60-60-15
Capacity2000-30003000-50005000-70007000-1000010000-1500016000-2000020000-24000
Filling precision≤+/-1mm(Liquid Level)≤+/-1mm(Liquid Level)≤+/-1mm(Liquid Level)≤+/-1mm(Liquid Level)≤+/-1mm(Liquid Level)≤+/-1mm(Liquid Level)≤+/-1mm(Liquid Level)
Filing pressure (MPa)≤0.4≤0.4≤0.4≤0.4≤0.4≤0.4≤0.4
Total power (kw)4.45.26.26.27.51115
Weight (kg)250035004500600072001000011500
Dimensions (mm)2250*1650 *22502600*1965 *22502980*2200 *22503880*2200 *22504000*2250 *25005500*3500 *25006500*5500 *2500

After-sales Service

  • Immediately engineer sending after visa and ticket ready
  • Over 10-year experienced engineers for machine installation and training
  • 7 days /week online for customer’s trouble shooting after installation
  • 1000m² spare parts warehouse ensure quick delivery within 12hours for urgent spare parts replacement

Contact Us

Please enable JavaScript in your browser to complete this form.
Functions needed
Product type
Packing type
Get a free quote
The staff will reply to you within 24 hours.
Please enable JavaScript in your browser to complete this form.
Functions needed
Product type
Packing type