Language: EN FR
Home > Machinery > Engineering Machines > Chiller > 3HP mould chiller for bottle blowing machine

3HP mould chiller for bottle blowing machine

    Title: 3HP mould chiller for bottle blowing machine

    Keywords: water chiller,mould chiller,mold chiller

Inquire Now
  • Quick Details
  • Detailed Descriptions
  • Packaging & Delivery
  • Services

    QUICK DETAILS:

    Model: 03WCI

    Brand: FILL-PACK

    Power: 2.5kw

    Voltage: 380V 3PH 50HZ or customized

    Driven force type: Electrical

    Automation degree: Automatic

    Dimension: 1100*650*1100mm

    Weight: 180kg

    Application: Bottle blowing machine

    Packing category: SUS304

    Packing material: SUS304

    Condition: New

    PROPERTIES:

    Capacity: 75800K cal/H 

    Flow water inlet and outlet pipe: 1 inch

    Key material: SUS304

    Fuction: Cooling for bottle blowing mould

    Processing liquid: water flow

    Origin: ZhangJiaGang, China

    After sales service: Engineers avaliable to service overseas

    Qualification: CE, ISO9001-2008

    Parameter for 3P mould chiller:

    Model

    03WCI

    4.4/38℃ Cooling capacity(Kcal/h)

    75800

    Compressor

    All-closed vorticity

    Compressor power (KW)2.5

    Refrigerant

    R22
    Chilled water pump power(KW)0.75
    10℃ Max. flow rate of chilled water(L/min)55

    Flow water inlet and outlet pipe

    1’’

    Condensing water rate L/min

    36

    Chilled water inlet and outlet pipe

    1’’

    Exterior dimension

    1100*650*1100
    Water tank capacity38L

    Weight

    180Kg

    Parameter for 5P mould chiller:

    Model

    AC05

    4.4/38℃ Cooling capacity(Kcal/h)

    11180

    Compressor

    All-closed vorticity

    Compressor power (KW)3.75

    Refrigerant

    R22
    Chilled water pump power(KW)0.75
    10℃ Max. flow rate of chilled water(L/min)90

    Flow water inlet and outlet pipe

    1’’

    Condensing water rate L/min

    36

    Chilled water inlet and outlet pipe

    1’’

    Exterior dimension

    1000*680*1250
    Water tank capacity50L

    Weight

    195Kg


    Packing: Wooden case packing.

    Delivery Time:The machine will be made within 45-50 working days after the bottle design are confirmed.

    Guarantee:

    We response for one year warranty for the machine, however, it without any human conduct. And provide one-year free spare part for client.  And send engineer to client’s company with client’s provision for flight charge and accommodation. Help install the machine, teaching their staff operate the machine and also, we do have a private school which help our client sending their staff to china, help them training. 


    After sales service:

    1.Installation & adjustment 

    After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.


    2.Training 

    We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance. 

    The buyer can send staff to our company for learning.


    3.Quality assurance 

    We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.

    We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.

    We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.

    The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.


    4.Warranty 

    Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.

Contact Us Now

We’d love to hear from you!

Contact Us

Copyright © ZhangJiaGang City FILL-PACK Machinery CO., LTD. All Rights Reserved    Technical Support:

Sitemap
Top