Language: EN FR
Home > Machinery > Engineering Machines > Boiler > 200KgPH LPG Steam Boiler

200KgPH LPG Steam Boiler

    Title: 200KgPH LPG Steam Boiler

    Keywords:diesel steam boiler, diesel steam generator, gas steam boiler

Inquire Now
  • Quick Details
  • Detailed Descriptions
  • Packaging & Delivery
  • Services

    QUICK DETAILS:

    Model: LHS0.2-0.4-Q

    Brand: Fillpack

    Power: N/A  

    Voltage: N/A

    Driven force type: LPG

    Automation degree: Automatic

    Dimension: 900*850*1910mm

    Weight: 600Kg

    Application:Steam or heating

    Packing category: N/A

    Packing material: N/A

    Condition: New


    PROPERTIES:

    Capacity: 200kg/h

    Applicable bottle size:N/A

    Key material: SUS304

    Fuction: Sleeve labeling for bottle  

    Processing liquid: N/A

    Origin: ZhangJiaGang, China

    After sales service: Engineers avaliable to service overseas

    Qualification: CE, ISO9001-2008


    Usage:

    The vertical steam boiler is widely used in paper mill, school cartoon, laundry room, feed mill, and so on, due to it is small in size, and easy operation.


    Principle:

    The steam boiler adopts mirror stainless or high quality color steel outsourcing, it includes concealment type control cable arrangement inside, spray combustion system overhead, it has the structure of heat transfer spirally corrugated tube and off center casing pipe type hearth. It reduces the pressure of pipe end, effectively prevent the tube plate cracking. The super thickness spirally corrugated tube (5mm) weld automatically, it equipped with first-class accessories, the OEM valve instrument, which ensure the safety and efficient operation of the boiler.


    Characteristics:

    1. New technology, large burning room, thermal efficiency and safe.

    2. Fully Automatic, can reach run without people.

    3. Small in size Suit for civil use.

    4. Vertical, save place, easy delivery

    5. An openable ash clean door is set at the bottom of the boiler. The top cover of the boiler can be opened for easy cleaning ash and prolong the endurance of the boiler.

    6. Controller is employed for the boiler for making the safety is available, and lower the running cost to a great extent.


    Main technical standards:

    Rated steam pressure: 0.4MPa

    Rated steam temperature: 152℃

    Feed water temperature: 20℃

    Designed thermal efficiency: 89%

    Heating area: 4.58m2 

    The flue diameter: 250mm

    Inlet diameter: DN25

    Main steam diameter: DN40

    Discharge diameter: DN40

    Gas consumption: 16.5kg/h

    Diesel consumption: 13kg/h

    Overall dimension: 900*850*1910mm

    Weight: 600kg

    Packing: Wooden case packing.

    Delivery Time: 20 working days after down payment.

    After sales service:

    1.Installation & adjustment 

    After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.


    2.Training 

    We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance. 

    The buyer can send staff to our company for learning.


    3.Quality assurance 

    We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.

    We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.

    We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.

    The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.


    4.Warranty 

    Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.

Contact Us Now

We’d love to hear from you!

Contact Us

Copyright © ZhangJiaGang City FILL-PACK Machinery CO., LTD. All Rights Reserved    Technical Support:

Sitemap
Top